Dry Land Sand Gold Separation Equipment: Mobile On-site Mineral Processing Complete Solutions

Aug 10, 2026

Leave a message

Manufactured with heavy-duty shipbuilding technology, land gold mining equipment is designed for on-site separation of sand gold deposits in gobi deserts, hills, ancient riverbeds and other dry land mining areas.

 

        Traditional fixed mineral processing plants come with high infrastructure investment and massive raw ore loss during transportation. This complete set integrates feeding conveying, high-pressure ore washing, graded separation and tailing water circulation systems. A diesel generator unit can be equipped for remote mining zones without municipal power supply. It can also connect with waterway mining machinery, delivering ore sand directly through pipelines to eliminate intermediate transit links, suitable for open-pit sand gold mining projects worldwide.

 

Technical Parameters

Parameter Item Small Model 10-30t/h Medium Model 50-100t/h Large Model 150-300t/h
Trommel Screen Size Φ600×1500mm Φ1200×3000mm Φ1800×6000mm
Max Feeding Particle Size ≤80mm ≤150mm ≤230mm
Total Installed Power 15-30kW 45-75kW 110-200kW
Overall Weight 1.5-3 tons 6-12 tons 18-30 tons

        Separation units include jigs, centrifugal separators and vibrating chutes for optional matching. Model specifications only distinguish hourly processing capacity, and separation performance will not fluctuate with equipment size. The whole machine is welded with thick ship-grade carbon steel and coated with multi-layer anti-corrosion paint, adapting to complex mining environments with wind sand and high humidity.

 

Core Advantages

          Wear-resistant Body with Standardized Universal Spare Parts The frame is made of thick ship carbon steel; trommel screens adopt high-manganese steel and separation liners are fitted with wear-resistant rubber. All wearing parts are universal standard accessories for easy procurement and replacement across overseas regions.

          Trailer-mounted Integrated Design, Splittable for Sea Shipment The complete machine is equipped with an integrated trailer chassis. Small units can be towed by ordinary vehicles, while large-sized equipment can be split into containers for ocean transport. No fixed foundation construction is needed when switching mining sites; operation can start on level ground.

          Coordinated Land & Water Operation to Cut Transit Costs It can work with all types of waterway gold mining machinery. Ore sand is transported directly via pipelines to separators, removing intermediate stockyards and short-distance transport trucks to lower comprehensive mining costs. Complete matched land & water mining equipment can be configured according to mining terrain.

          Customized Matching for All Mining Conditions A cylinder scrubber can be added for ore layers with high clay content; a circulating water sedimentation system is optional for arid and water-shortage mining areas; diesel generator sets can be fitted for sites without power supply. Automatic ore discharge and remote monitoring modules are available for upgrade.

 

Application Cases

           Land & Water Integrated Mining Project in West Africa Local sand gold deposits contain high clay content with unstable municipal power supply. The project adopts waterway mining machinery matched with a 50t/h complete separation set, equipped with diesel power generation and water circulation devices. Ore sand excavated underwater is delivered directly to land separation units through pipelines. The high-pressure washing structure breaks up agglomerated clay, and local spare parts warehouses provide after-sales support.

           Gobi Sand Gold Mining Project in Central Asia The mining area features arid climate and high proportion of fine-grained ore. An 80t/h complete separation set with water-saving circulating structure is selected to reduce water consumption effectively. The equipment supports whole-machine trailer transfer, allowing flexible switching between mining sites to guarantee continuous mining operation.

 

FAQ

Q: What is the minimum order quantity?

A: Single unit orders are acceptable for standard models; separate scheme evaluation is required for special non-standard customized configurations.

 

Q: Can mineral samples be sent for process matching testing?

A: Mineral sample testing service is available, and matched technological process selection reports can be issued.

 

Q: What is the unified payment term?

A: Fixed 3/4/3 payment term: 30% advance payment for production arrangement, 40% balance settled before shipment, and the remaining 30% paid after on-site equipment acceptance. Letters of Credit (L/C) can be negotiated for large long-term cooperation orders, and USD T/T wire transfer is supported for export orders.

 

Q: Warranty and after-sales support policy?

A: Standard warranty service covers the whole machine, with an extended warranty period for core components including motors and reducers. Wearing parts are excluded from warranty coverage. Remote online technical guidance is provided for overseas clients; technicians can be arranged for on-site installation and commissioning, with all travel expenses borne by the buyer. Cooperative spare parts warehouses are established in multiple regions.

 

Q: What certification documents can be provided for export?

A: CE certification is available for exports to the EU. General Certificate of Origin, preferential regional Certificate of Origin, packing list, commercial invoice and ocean bill of lading can be supplied. Assistance is available for applying pre-shipment inspection formalities required by certain countries.

Send Inquiry